Quality That You Can Trust!

Process Flow and Process & Instrumentation Diagrams
Working with you to develop your project, including process specifications, process flow digrams, process and instrumentation diagrams and generation of equipment, valve and instrumentation lists.

HAZOP
Working with a HAZOP leader Inox Design can help with develop the process safety and adapt designs to suit the outcomes.

3D CAD Modeling
Whether working from a concept, detailed specification or from existing equipment, Inox Design can model your process using Solidworks to ensure successful implementation of installation or any changes.
Engineering Drawings
We will take your project concept through the design process and generate manufacuring drawings allowing your concepts to be turned into reality
Industry Standards
Inox Design complies with relevant industry standards and provides documentation, ensuring your projects meet the necessary industry standards. These include
PED
PE(S)R
PD5500
ATEX directive
Machinery directive
ASME BPE

Control Systems
Inox Design works with trusted partners to supply suitable control systems for your process.
